WEB DESIGN / FRONTEND IMPLEMENTATION
Clear pages.
Useful interactions.
Responsive pages shaped around your content, with working browser interactions and source files you can keep. Explore the concepts, then discuss one clearly defined project.
Explore the work ↘
Two concepts.
Open them and try them.
Original concept projects.
Not client commissions.
Both demos use plain HTML, CSS and JavaScript, with Chinese demo copy. They were made through AI-assisted development and browser checks. The screenshots below are actual page captures.
01 / CONVERSATION
Creekside 溪岸
A quieter space for a conversation.
A conversation interface with two visual themes, measured typography and a travel-notebook setting. The page keeps the conversation central on desktop and mobile.
- ThemesMorning and night, switchable in the demo.
- InteractionsSend a message; edit the on-page travel details.
- LayoutThree columns on desktop, one on mobile.
A fictional character and local fixed replies. No live AI or backend; messages and edits stay in the current page and are not saved. Demo text is Chinese.
Folio / actual screenshotProduct page and scheduling preview
Upper-page preview / open the demo for the full pageFull screenshot ↗
02 / PRODUCT PAGE
Folio 序页
From a product story to something you can try.
A single-page concept for a small-team planning tool. Product explanation leads into a working browser preview, followed by a usage path and FAQ.
- ContentProduct introduction, features and questions.
- InteractionsSwitch projects, change week/month views and open task details.
- LayoutResponsive desktop and mobile presentation.
A fictional product with demo data. Booking and trial buttons show a sample notice; they do not create bookings or submit information. No backend. Demo text is Chinese.
Start with a page
we can define together.
Choose the scope that fits your project. The final quote, scope and timing are agreed before work starts.
SMALL STATIC PAGE / TRIAL OFFER
One focused page
USD 150 / project
- One static page with up to 4 agreed content sections.
- You provide final copy, usable brand assets and images.
- Desktop and mobile layouts; basic interactions as agreed.
- One consolidated revision within the agreed scope.
- HTML/CSS/JS source, assets and setup notes.
Estimated 5 working days once the agreed materials are ready, subject to the confirmed brief and schedule. Extra sections or functionality require a new scope.
Enquire about this page ↗
BROADER CHINESE PAGE / TRIAL OFFER
More room for the story
CNY 2,499 / project
- One Chinese page with up to 7 content sections.
- Page structure and copy organisation from your supplied materials.
- Responsive layout and agreed frontend interactions.
- Two revisions within the confirmed scope.
- Source files, assets and usage notes.
The fuller brief, any assistance with an existing static hosting setup, and timing are confirmed separately. This is a different scope from the USD 150 offer.
Discuss the fuller brief ↗
The USD 150 offer excludes backend development, CMS, account or login systems, payments, original copywriting and hosting account operations. These are not standard inclusions in the broader offer either; any extra work must be assessed and explicitly agreed. Concept galleries show design and implementation examples, not the complete feature set of either package.
Useful files, with a clear scope.
For a repeatable calculation or a finished set of presentation content. The downloadable samples use Chinese text and show original work, not client commissions.
An automatically calculating quotation sheet
CNY 499
One macro-free XLSX format with up to 20 item rows, quantities, unit prices, discounts and totals. Includes usage notes and one consolidated in-scope adjustment. Calculation rules and a reference result are agreed first.
The sample has 10 input rows and explicitly fictional items and prices. It is not a formal quotation. No external-system sync, inventory system or tax judgement is included.
Presentation layout from final content
CNY 199 / 3-page trial
You provide final copy, usable assets and a reference direction. Receive an editable PPTX, page previews and one consolidated in-scope adjustment. Original writing, research, complex charts, animation and video are excluded.
Expand the same project to up to 10 pages for CNY 599 total; the CNY 199 trial amount is credited towards that total. The sample introduces our own service. Text and basic shapes are editable; screenshots are images.
File samples have generation, recalculation or render checks as applicable. Native editing in Excel, PowerPoint or WPS has not been verified. Software versions, fonts and compatibility must be checked for your commissioned environment. Final scope, quote and timing are agreed before starting.
Full Office service details (Chinese) ↗
Agree the work.
Then make it tangible.
Our workflow uses AI-assisted development and browser checks for web work, with file checks appropriate to each office deliverable.
- 01
Share the brief
Describe the goal, required content or calculations, existing materials and deadline. For office files, include the software and version you use.
- 02
Confirm scope and quote
Agree the output, acceptance criteria, revision limits and schedule before work begins. Sensitive examples should be redacted first.
- 03
Check and hand over
Check against the agreed brief, make in-scope adjustments and supply the source or editable files with usage notes. The delivery record states what was actually checked.